PESO License for Fireworks & Explosives: Foreign Company Manufacturing Guide

Foreign companies entering India's fireworks and explosives manufacturing sector must navigate PESO licensing under the Explosives Rules, 2008. This guide covers the licensing categories, application process, industrial license requirements, and FDI regulations for explosives manufacturing.

March 21, 20267 min read
7 min readLast updated September 3, 2026
Written by Ayushi Chauhan, Associate, FDI & ECB AdvisoryReviewed by Dev Rao, Chartered Accountant

Why PESO Licensing Matters for Foreign Manufacturers

Foreign companies manufacturing fireworks or explosives in India need a Petroleum and Explosives Safety Organisation (PESO) licence under the Explosives Rules, 2008. Every licence to manufacture an explosive is granted in Form LE-1; what changes with scale is the licensing authority, not the form. Industrial explosives also sit under compulsory industrial licensing, so an industrial licence under the Industries (Development and Regulation) Act, 1951 is required on top of the PESO licence. That industrial licence is a separate approval from the foreign-investment entry route — it gates the business, not the investment.

PESO, operating under the Department for Promotion of Industry and Internal Trade (DPIIT), regulates the manufacture, import, export, transport, possession, sale, and use of explosives, petroleum products, and compressed gases across India. No entity can legally handle explosives without the appropriate PESO license, and violations carry severe criminal penalties including imprisonment.

Understanding PESO: Organisational Structure and Authority

PESO is headquartered in Nagpur, Maharashtra, with Circle and Sub-Circle offices across India. It sits within the Department for Promotion of Industry and Internal Trade (DPIIT), Ministry of Commerce and Industry, and draws its authority from several key statutes:

  • The Explosives Act, 1884: The primary legislation governing explosives in India, providing PESO with the authority to regulate manufacture, possession, use, sale, transport, import, and export of explosives
  • The Explosives Rules, 2008: The detailed regulatory framework specifying license categories, application procedures, safety standards, and compliance requirements
  • The Explosive Substances Act, 1908: Creates the serious criminal offences for causing explosions likely to endanger life or property and for making or possessing explosive substances with intent
  • The Arms Act, 1959: Covers certain categories of ammunition and military-grade explosives
Article illustration

PESO License Categories Under the Explosives Rules, 2008

The Explosives Rules, 2008 prescribe several license forms depending on the nature and scale of the activity. Foreign companies must identify the correct license category before applying.

The single most common mistake in this sector is assuming that the form number rises with the scale of the operation. It does not. Schedule IV, Part 1 of the Explosives Rules, 2008 assigns one form per purpose, and manufacture — at every scale — is Form LE-1.

FormWhat it authorises (Schedule IV, Part 1)Licensing authority
LE-1Manufacture. Article 1(a): fireworks or gunpowder not exceeding 15 kg at any one time. Article 1(b): 15–500 kg. Article 1(c): exceeding 500 kg. Article 1(d): ANFO at site not exceeding 200 kg. Article 1(e): liquid oxygen explosives. Article 1(f): site mixed explosives. Article 1(g): explosives other than fireworks, gunpowder, ANFO, LOX and SMEDistrict Magistrate for 1(a); Controller of Explosives for 1(b) and 1(d); Chief Controller (or an authorised Controller) for 1(c), 1(e), 1(f) and 1(g)
LE-2Possess gunpowder not exceeding 15 kg at any one time for the narrow manufacturing purpose set out in Article 2, with the finished articles capped at 200 in numberDistrict Magistrate
LE-3Possession in a magazine or storehouse. Article 3(a): possess for use for agriculture or in a small quarry, not exceeding 50 kg of Class 1, 2 or 3 with 1,500 detonators and 1,500 metres of detonating or safety fuse. Article 3(b): possess for sale, Classes 1–7, in a magazine. Article 3(c): possess for use, Classes 1–7, in a magazine. Article 3(d): possess fireworks up to 5,000 kg in a storehouse, not for sale but for transfer to the licensee's own licensed shopDistrict Magistrate for 3(a); Chief Controller or authorised Controller for 3(b), 3(c) and 3(d)
LE-4Possess and transport Class 2 or Class 3 explosives up to 25 kg, with up to 200 detonators, 100 metres of detonating fuse and 200 metres of safety fuse, in a compressor-mounted motor truck or tractor for use in well sinkingDistrict Magistrate
LE-5Retail. Possess and sell from a shop — small-arms nitro-compound up to 25 kg; manufactured fireworks of Class 7 up to 100 kg with 500 kg of Chorsa crackers or sparklers; up to 2,000 pyrotechnic devices of Class 6; and, under Article 5(f), fireworks of 100–300 kg with 500–1,200 kg of crackers or sparklersDistrict Magistrate, except Article 5(f) which is the Controller of Explosives
LE-6Possess and use fireworks for public displayDistrict Magistrate
LE-7Transport explosives in a road van, or in a freight container mounted on a fixed-chassis motor truck or goose-neck semi-trailerController of Explosives
LE-8Import or export explosivesChief Controller
LE-9 (Special)Manufacture, possess, sell or use explosives in a situation not covered by Articles 1 to 8Chief Controller

So a foreign company building a commercial explosives plant applies for a licence in Form LE-1 under Article 1(g), granted by the Chief Controller — not Form LE-5, which is a shopkeeper's retail licence. A fireworks plant above 500 kg at a time is Form LE-1 under Article 1(c), also from the Chief Controller.

Safety Management Plan

A safety management plan is not required for every licence. Rule 26(2)(g) requires one as part of the application for approval of the manufacturing process where the product is a high explosive or a blasting accessory, and rule 26(3) prescribes its contents — organisational responsibilities, hazard identification and risk assessment, training, accident reporting, emergency response and escape routes, explosives-and-man limits per building, waste disposal and self- and external auditing. Rule 27 requires a copy to be filed with the District Magistrate.

Industrial License Requirement: A Critical Prerequisite

Manufacturing industrial explosives in India requires an industrial licence under the Industries (Development and Regulation) Act, 1951 (IDR Act). This is separate from and in addition to the PESO licence. Industrial explosives are one of the small number of items for which industrial licensing survived de-licensing. Check the scope carefully before assuming it applies to your product line: the compulsory-licensing entry is directed at industrial explosives and related items rather than at consumer fireworks, which are licensed by PESO in Form LE-1.

Who Can Apply for an Industrial License

Only Indian-incorporated companies can apply for an industrial license for explosives manufacturing. A foreign company cannot directly hold an industrial license. This means foreign companies must establish an Indian entity, typically a private limited company or a wholly owned subsidiary, before applying.

Application Process for Industrial License

  1. Apply through the National Single Window System at nsws.gov.in. Industrial Licence and Industrial Entrepreneur Memorandum applications have been migrated off DPIIT's older G2B portal, which no longer accepts new filings
  2. Submit the application in the prescribed format with details of the proposed manufacturing activity, capacity, location, and investment
  3. The application is reviewed by the Industrial Licensing Committee, which includes representatives from relevant ministries
  4. For explosive manufacturing, security clearance from the Ministry of Home Affairs is mandatory
  5. The industrial license specifies the type and quantity of explosives that may be manufactured, the location of the manufacturing facility, and the installed capacity
Article illustration

FDI Rules for Explosives Manufacturing

Foreign direct investment in manufacturing is generally permitted up to 100% under the automatic route. However, explosives manufacturing sits at the intersection of industrial licensing and security-sensitive activities, which introduces additional regulatory layers.

Key FDI Considerations

  • Industrial licence is not an FDI entry route: foreign investment in manufacturing is permitted up to 100% on the automatic route under Schedule I of the Non-debt Instruments Rules, but that permission is expressly subject to applicable laws. A compulsory industrial licence under the IDR Act is one of those laws — it must be obtained, and it can stop the project, but it does not by itself convert the investment into the government approval route. Confirm the entry route for your exact activity against the current Schedule I entry before assuming either position
  • Defence explosives: Manufacturing of defence-grade explosives falls under the defence FDI cap of 74% under the automatic route and up to 100% under the government approval route for modern technology access
  • Commercial explosives: manufacture for mining, construction and fireworks turns on two separate approvals — the PESO licence in Form LE-1 and, for industrial explosives, the IDR Act industrial licence — rather than on an FDI-specific approval
  • Security clearance: All foreign investments in explosives manufacturing are subject to security clearance from the Ministry of Home Affairs

Companies entering India from the United States, United Kingdom or other jurisdictions should budget for the industrial licence and the security clearance that accompanies it, which are the binding constraints on the start date rather than the investment filing.

Step-by-Step: Obtaining a PESO License for Manufacturing

The process of obtaining a PESO license for explosives or fireworks manufacturing involves multiple stages. Working with a professional advisory firm is strongly recommended given the regulatory complexity.

Stage 1: Pre-Application Requirements

  • Obtain an industrial licence from DPIIT through NSWS, where the product is an industrial explosive
  • Identify and secure a suitable manufacturing site that meets PESO distance and safety requirements
  • Prepare a comprehensive Safety Management Plan
  • Obtain environmental clearances from the State Pollution Control Board
  • Secure a no-objection certificate (NOC) from the District Magistrate

Stage 2: Application Submission

  1. File through the National Single Window System at nsws.gov.in, which PESO has directed applicants to use since its circular of 16 February 2022; PESO's own module is reached from online.peso.gov.in
  2. Register as a new applicant with company details
  3. Select the appropriate license form (LE-1, LE-5, etc.)
  4. Upload all required documents including Safety Management Plan, site plans, process descriptions, equipment details, and proof of industrial license
  5. Pay the prescribed application fee online

Stage 3: Site Inspection and Verification

  • PESO conducts a physical inspection of the proposed manufacturing site
  • The inspection verifies compliance with safety distance requirements, magazine storage specifications, manufacturing process safety, and emergency response preparedness
  • The inspector submits a report with recommendations to the Chief Controller of Explosives

Stage 4: License Issuance

  • Upon satisfactory inspection and document verification, PESO issues the license
  • The license specifies the types of explosives permitted, maximum quantities, and conditions of operation
  • Under rule 106 the licensing authority may grant the licence for the period it considers necessary, up to ten financial years — the Explosives (Amendment) Rules, 2025 omitted the separate five-financial-year entry for manufacture and storage magazines, so those licences now fall in the ten-financial-year residual category; the licence runs to 31 March of the last year granted

Timeline

The complete process, from industrial license application to PESO license issuance, typically takes 6-12 months. The industrial license stage often accounts for 3-4 months of this timeline, with the PESO licensing process itself taking approximately 3 months from document submission to license issuance.

Article illustration

Documentation Checklist

Applicants must prepare the following documentation for a PESO manufacturing license:

  • Certificate of Incorporation of the Indian entity
  • Industrial license issued by DPIIT
  • Safety management plan under rule 26(2)(g), where the process approval covers a high explosive or a blasting accessory, with a copy to the District Magistrate under rule 27
  • Detailed site plan showing buildings, magazines, and safety distances
  • Manufacturing process description and flow diagrams
  • Equipment specifications and machinery list
  • NOC from the District Magistrate
  • Environmental clearance from the State Pollution Control Board
  • Fire safety certificate from the State Fire Service
  • ISO certification (if available, strengthens the application)
  • Qualifications and experience of the technical personnel
  • Emergency response plan and disaster management procedures
  • Insurance documentation for the premises and operations

Compliance and Renewal Requirements

Obtaining the PESO license is not the end of the regulatory journey. Ongoing compliance is critical and subject to regular inspection.

Annual Compliance

  • Quarterly returns: rule 24(3) requires quarterly returns of explosives (other than fireworks) manufactured, received, sold, transferred, used, destroyed, imported or exported, filed with the Controller and the District Magistrate through the Central Government's online explosives tracking and tracing system within ten days of the end of each quarter
  • Accident reporting: Any accident involving explosives must be reported to PESO within 24 hours
  • Safety audits: Conduct internal safety audits and maintain records for PESO inspection
  • Record keeping: Maintain detailed records of all explosives manufactured, received, issued, used, and destroyed

License Renewal

A licence to manufacture explosives may be granted for up to ten financial years and expires on 31 March (rule 106, as amended in 2025; rule 112(1) sets the same ten-financial-year maximum for renewals). Under rule 112(4) the renewal application must reach the licensing or renewing authority on or before the date the licence expires; if it does, rule 112(5) keeps the licence in force until the authority decides. A late application is expensive and eventually fatal: rule 112(6) allows renewal on payment of a penalty fee equal to one year's licence fee, and rule 112(10) bars renewal altogether once the application arrives more than three months after expiry, at which point it is treated as an application for a new licence. Build the filing date into your annual compliance calendar well before 31 March.

Article illustration

Importing Rather Than Manufacturing

A foreign company that wants to sell into India without building a plant still needs a PESO licence, but a different one. Import or export of explosives is licensed by the Chief Controller in Form LE-8 (Schedule IV, Part 1, Article 8; the qualifier "otherwise than by land" was removed by the Explosives (Amendment) Rules, 2019). Because the licence is held in India, the importer must be an Indian entity — the foreign manufacturer's own subsidiary, its sales office, or an independent importer or distributor appointed for the purpose.

What to plan around

  • Short validity. Rule 106(1) caps an import or export licence at six months, so it is granted against a defined consignment rather than as a standing permission. Plan the licence around each shipment, not around the financial year
  • The Indian entity carries the compliance. Whoever holds the licence is answerable to PESO for storage, transport and record-keeping once the goods land, so the appointment needs a written agreement covering those obligations, not just a distribution margin
  • The magazine comes first. Imported explosives have to go somewhere licensed. A licence in Form LE-3 for a magazine, or LE-5 for shop stock, generally has to be in place before the import is useful
  • Scrutiny fee. Schedule IV, Part 2 sets the scrutiny fee for an application for a licence to import or export explosives at INR 500

Environmental and Safety Regulations

The Supreme Court of India has imposed significant restrictions on fireworks, particularly concerning environmental pollution. Foreign manufacturers must be aware of these evolving regulations.

Green Crackers Mandate

Following Supreme Court directions in the long-running fireworks pollution litigation, manufacture and sale has been restricted to "green crackers" — reduced-emission formulations developed by CSIR-NEERI, with barium salts and joined crackers prohibited. Formulations are approved by CSIR-NEERI and the resulting product must be covered by the PESO licence; non-compliant stock is liable to seizure. The directions have been repeatedly modified and several states and the NCR operate stricter local bans, so verify the position for each state you supply before committing production.

Seasonal Restrictions

Several states and cities impose seasonal bans or time restrictions on fireworks, particularly around Diwali. These restrictions affect both manufacturers and distributors and must be factored into business planning.

Article illustration

Penalties for Non-Compliance

Operating without a valid PESO license or violating the terms of an existing license carries severe penalties under Indian law. Section 9B of the Explosives Act, 1884 prescribes, for a contravention of the rules made under section 5 or of a licence condition, imprisonment of up to three years or a fine of up to INR 5,000 or both for manufacturing, importing or exporting an explosive; up to two years or INR 3,000 or both for possessing, using, selling or transporting one; and a fine of up to INR 1,000 in any other case. The Explosive Substances Act, 1908 applies separately, and far more severely, where an explosion or an intent to endanger life or property is involved. Beyond criminal sanctions, the authorities can seize all explosives and equipment found on the premises, effectively shutting down operations.

Foreign companies should note that directors and officers of the Indian entity can be held personally liable for violations. This underscores the importance of maintaining current licenses, filing all required returns, and conducting regular internal safety audits. Companies should engage professional compliance support to ensure no deadlines are missed.

Key Takeaways

  • PESO licensing is mandatory for any entity manufacturing, storing, transporting, or dealing in explosives and fireworks in India
  • Manufacture is licensed in Form LE-1 at every scale — LE-5 is a retail shop licence, not a factory licence — and for industrial explosives an IDR Act industrial licence from DPIIT, obtainable only by an Indian-incorporated entity, is required as well
  • The industrial licence, not the FDI filing, is the gate. Foreign investment in manufacturing is on the automatic route subject to applicable laws; the IDR Act licence and its security clearance are separate approvals that must be obtained regardless of the shareholding
  • The complete licensing process takes 6-12 months from industrial license application to PESO license issuance
  • A manufacturing licence runs to 31 March and may be granted for up to ten financial years, with the renewal application required to reach the authority on or before the expiry date
  • Importing without manufacturing runs on a Form LE-8 licence from the Chief Controller, capped at six months, held by an Indian entity with licensed storage already in place

Need help with Sector Licensing? Our team handles it.

FDI Advisory
FAQ

Frequently Asked Questions

Can a foreign company directly obtain a PESO license in India?

No. A PESO licence is issued to a person or entity in India, so a foreign company must establish an Indian subsidiary (typically a private limited company) before applying, and the same is true of the IDR Act industrial licence required for industrial explosives. A foreign company that only wants to import can instead have an Indian entity — its own subsidiary or an appointed importer or distributor — hold a licence in Form LE-8 from the Chief Controller.

How long does it take to get a PESO license for explosives manufacturing?

The complete process takes 6-12 months. The industrial license from DPIIT typically takes 3-4 months, and the PESO licensing process itself takes approximately 3 months from document submission to license issuance, including site inspection.

What is the validity period of a PESO manufacturing license?

Under rule 106 of the Explosives Rules, 2008 a licence to manufacture explosives or to operate a storage magazine may be granted for up to ten financial years, and it expires on 31 March — the Explosives (Amendment) Rules, 2025 omitted the old clause (3) five-year entry and raised the rule 112(1) renewal maximum to ten financial years. Rule 112(4) requires the renewal application to reach the licensing or renewing authority on or before the expiry date; if it does, the licence stays in force until the authority decides. Renewal beyond three months after expiry is barred by rule 112(10) and the application is treated as one for a new licence.

Is 100% FDI allowed in explosives manufacturing in India?

Compulsory industrial licensing and the foreign-investment entry route are two different things. Foreign investment in manufacturing is permitted up to 100% on the automatic route under Schedule I of the Non-debt Instruments Rules, subject to applicable laws — and for industrial explosives the IDR Act industrial licence, with its security clearance, is one of those laws. It must be obtained, but it is not an FDI approval. Defence-grade production is different: the defence entry has a 74% automatic cap with more permitted under the government route. Confirm the Schedule I entry for your exact activity before relying on either route.

What is the difference between Form LE-1 and Form LE-5?

They are not two rungs of the same ladder. Form LE-1 is the manufacturing licence at every scale: Article 1(a) covers fireworks or gunpowder up to 15 kg at a time from the District Magistrate, Article 1(b) covers 15-500 kg from the Controller, Article 1(c) covers above 500 kg from the Chief Controller, and Article 1(g) covers explosives other than fireworks, gunpowder, ANFO, LOX and SME. Form LE-5 is a retail licence to possess and sell from a shop. A foreign company building a plant needs Form LE-1, normally under Article 1(c) or 1(g).

What are green crackers and are they mandatory for fireworks manufacturers?

Green crackers are reduced-emission formulations developed by CSIR-NEERI. Following Supreme Court directions in the fireworks pollution litigation, manufacture and sale has been restricted to these formulations, with barium salts and joined crackers prohibited, and non-compliant stock is liable to seizure. The directions have been modified several times and a number of states and the NCR apply stricter local restrictions, so confirm the current position for each state you supply.

This article is for general information only and is not legal, tax, or investment advice. Confirm current rules with the relevant authority or a qualified professional — or ask our team. See our full disclaimer.

Topics
peso licenseexplosives manufacturingfireworks indiaindustrial licensesector licensing india